Here's my production schedule as of right now:
Production Schedule
And here's my task list of sorts...
January 18
-Update blog
-Fix the beginning of film
-Composite new parts of film into the Leica
-complete 5 seconds of animation
January 19 -31
-animate 5 seconds everyday except for Saturday and Sunday (animate 5 seconds in total for those two days)
-start character bios (have at least 3 characters done by the end of the month)
-have sounds recorded for sound designer by Jan 31
-send sounds to sound designer once collected
-finish sound designer contract
-find a 3rd year who can help colour my animations
-complete 2 backgrounds a day
-remember to eat/sleep-get more tea
(1:25-1:30 minutes of animation done by the end of Jan)
(26 Backgrounds done by end of Jan)
February 1-28
-animate 5 seconds everyday except for Saturday and Sunday (animate 5 seconds in total for those two days)
-re-record/send any sounds I find after or need to do over for sound designer by the end of the first week of Feb
-finish the last 2 character bios (due on Feb 9)
-complete 2 backgrounds a day (should be done by Feb 12)
-remember READING BREAK is from February 21-26 (going to Victoria from Feb 24-26)
March 1-31
-Keep up the 5 seconds of animation a day unless more/less is needed to have all animation done by March 15
-the rest of March will be editing the animation as well as a buffer point to finish any more seconds of animation that might still need to be completed.
-begin test renders by the end of the month
April 1-13
-have entire animation + sound completely rendered in HD by April 5th
-time between April 5 and April 12 is a buffer for the final render
-HAVE EVERYTHING COMPLETED AND READY TO HAND IN BY APRIL 12
-FINAL GRAD PANEL IS ARPIL 13-19 DX
-rest of the month is to fix anything that might need it for the very final product
May
-Graduation May 7
-sleep for rest of month